Mumbai :
The
Transportation Infrastructure business vertical of L&T has secured a significant*
contract for the improvement of Latifa Bint Hamdan Street in Dubai, UAE. The
order pertains to the Phase-1 of the road development initiative undertaken by the
UAE authorities.
The scope of the
project includes upgrading the existing road corridor stretching from Emirates
Road (E611) to Sheikh Mohammed Bin Zayed Road (E311). The work involves widening
the current two‑lane dual carriageway
into a four‑lane dual carriageway
in each direction to enhance network capacity and ease traffic flow.
A significant feature
of the project will be the construction of a major structural interchange at
E311, designed to enable seamless traffic movement across all directions.
Beyond the
interchange, the corridor will be extended with a new four‑lane dual carriageway
along Latifa Bint Hamdan Street. The development also includes a dedicated
interchange to facilitate U‑turn
movements and provide improved access to developments located on both sides of
the corridor. The project is scheduled to be completed in 36 months.